this new construction project residence Horsemaster provides 15 brand new apartments, all are equipped with a low E level, a south facing terrace, floor heating and floor cooling with geothermal, fitted kitchen with granite kitchen tablet, sanitary and ceramic floors to choose, accessible by lift, there is in each building a reverse to the parking spaces and the park garden, the demolition works start in 2022, the buildings will rise from the ground in 2023 to be completed mid 2024 ! more information can be found at www.hordenmeester.be or you will send an email to [email protected]