Okoti
Buy›Naast›HouseRef. 154108 · listed 23d ago← Back to results
For sale

House for sale in Naast

Chaussée du Roeulx 390, 7062 Naast
€382,000
186 m²
Area
4
Bedrooms
1
Bathrooms
209 m²
Plot

Description

New single-family house 2 facades, 4 bedrooms, 186.20 m2 on a plot of 209 m2. Sale on plan in the project "Les Maisons Dana II", in Naast. REZ-DE-CHAUSSÉE : living and dining room open on a kitchen equipped with island, toilet, laundry. 1st LOCATION: night hall, 4 bedrooms, bathroom with bath and shower, separate toilet. Variant possible with two bathrooms upstairs, for a surcharge. EXTERIOR: garage G1, terrace of 20 m2, garden. THE MOST: floor heating powered by a heat pump that also produces sanitary hot water; dual flow ventilation with heat recovery; 10,000 liter rainwater tank connected to the dwelling; PVC chassis and high-efficiency double glazing (K = 1.0 W/m2K); motorized garage door with two remote controls; equipped kitchen to accommodate the builder. 3.5 km from the centre of Soignies, quick access to the E19 and E42, bordering the woods of The Hague of Roeulx. TO KNOW: sale on a plan subject to the Breyne law. The price is inclusive of fees and taxes: registration fees on the land share, 21% VAT on constructions, division fee estimated at 720 € VAT and measurement fee at 1,150 € VAT per lot. 5 % deposit at the signing of the compromise, balance payable in instalments depending on the progress of work. The areas advertised are the raw surfaces included in the sales plan. BEP: New construction, certificate is issued upon receipt of the building. The specifications set a class A target with a specific consumption range of 45 to 85 kWh/m2. Price: €382,000 excluding fees and taxes. Information: Alex Invest Immobilier.

Detailed features

General
Property typeHouse
Reference154108

Location

Energy performance certificate (PEB)

A++
A+
A
A · 85 kWh/m²·yr
B
C
D
E
F
G
Estimated annual cost~ €5,059 / yr
Certified consumption × 186 m², at 2025 gas/electricity rates.

Listing history

DateEventPriceChange
25 Sept 2026●Listed€382,000—
25 Sept 2026●Price increase€396,000+€14,000
25 Sept 2026●Price cut€386,760-€9,240
25 Sept 2026●Price increase€397,000+€10,240
25 Sept 2026●Price cut€385,000-€12,000
25 Sept 2026●Price cut€382,000-€3,000
25 Sept 2026●Price increase€396,000+€14,000
25 Sept 2026●Price cut€386,760-€9,240
25 Sept 2026●Price increase€397,000+€10,240
25 Sept 2026●Price cut€385,000-€12,000
25 Sept 2026●Price cut€382,000-€3,000
26 Sept 2026●Price increase€396,000+€14,000
26 Sept 2026●Price cut€386,760-€9,240
26 Sept 2026●Price increase€397,000+€10,240
26 Sept 2026●Price cut€385,000-€12,000
26 Sept 2026●Price cut€382,000-€3,000
26 Sept 2026●Price increase€396,000+€14,000
26 Sept 2026●Price cut€386,760-€9,240
26 Sept 2026●Price increase€397,000+€10,240
26 Sept 2026●Price cut€385,000-€12,000
26 Sept 2026●Price cut€382,000-€3,000
26 Sept 2026●Price increase€396,000+€14,000
26 Sept 2026●Price cut€386,760-€9,240
26 Sept 2026●Price increase€397,000+€10,240
26 Sept 2026●Price cut€385,000-€12,000
26 Sept 2026●Price cut€382,000-€3,000
26 Sept 2026●Price increase€396,000+€14,000
26 Sept 2026●Price cut€386,760-€9,240
26 Sept 2026●Price increase€397,000+€10,240
26 Sept 2026●Price cut€385,000-€12,000
26 Sept 2026●Price cut€382,000-€3,000
27 Sept 2026●Price increase€396,000+€14,000
27 Sept 2026●Price cut€386,760-€9,240
27 Sept 2026●Price increase€397,000+€10,240
27 Sept 2026●Price cut€385,000-€12,000
27 Sept 2026●Price cut€382,000-€3,000
27 Sept 2026●Price increase€396,000+€14,000
27 Sept 2026●Price cut€386,760-€9,240
27 Sept 2026●Price increase€397,000+€10,240
27 Sept 2026●Price cut€385,000-€12,000
27 Sept 2026●Price cut€382,000-€3,000
27 Sept 2026●Price increase€396,000+€14,000
27 Sept 2026●Price cut€386,760-€9,240
27 Sept 2026●Price increase€397,000+€10,240
27 Sept 2026●Price cut€385,000-€12,000
27 Sept 2026●Price cut€382,000-€3,000
28 Sept 2026●Price increase€396,000+€14,000
28 Sept 2026●Price cut€386,760-€9,240
28 Sept 2026●Price increase€397,000+€10,240
28 Sept 2026●Price cut€385,000-€12,000
28 Sept 2026●Price cut€382,000-€3,000
28 Sept 2026●Price increase€396,000+€14,000
28 Sept 2026●Price cut€386,760-€9,240
28 Sept 2026●Price increase€397,000+€10,240
28 Sept 2026●Price cut€385,000-€12,000
28 Sept 2026●Price cut€382,000-€3,000
28 Sept 2026●Price increase€396,000+€14,000
28 Sept 2026●Price cut€386,760-€9,240
28 Sept 2026●Price increase€397,000+€10,240
28 Sept 2026●Price cut€385,000-€12,000
28 Sept 2026●Price cut€382,000-€3,000
28 Sept 2026●Price increase€396,000+€14,000
28 Sept 2026●Price cut€386,760-€9,240
28 Sept 2026●Price increase€397,000+€10,240
28 Sept 2026●Price cut€385,000-€12,000
28 Sept 2026●Price cut€382,000-€3,000
29 Sept 2026●Price increase€396,000+€14,000
29 Sept 2026●Price cut€386,760-€9,240
29 Sept 2026●Price increase€397,000+€10,240
29 Sept 2026●Price cut€385,000-€12,000
29 Sept 2026●Price cut€382,000-€3,000
29 Sept 2026●Price increase€396,000+€14,000
29 Sept 2026●Price cut€386,760-€9,240
29 Sept 2026●Price increase€397,000+€10,240
29 Sept 2026●Price cut€385,000-€12,000
29 Sept 2026●Price cut€382,000-€3,000
29 Sept 2026●Price increase€396,000+€14,000
29 Sept 2026●Price cut€386,760-€9,240
29 Sept 2026●Price increase€397,000+€10,240
29 Sept 2026●Price cut€385,000-€12,000
29 Sept 2026●Price cut€382,000-€3,000
30 Sept 2026●Price increase€396,000+€14,000
30 Sept 2026●Price cut€386,760-€9,240
30 Sept 2026●Price increase€397,000+€10,240
30 Sept 2026●Price cut€385,000-€12,000
30 Sept 2026●Price cut€382,000-€3,000
30 Sept 2026●Price increase€396,000+€14,000
30 Sept 2026●Price cut€386,760-€9,240
30 Sept 2026●Price increase€397,000+€10,240
30 Sept 2026●Price cut€385,000-€12,000
30 Sept 2026●Price cut€382,000-€3,000
30 Sept 2026●Price increase€396,000+€14,000
30 Sept 2026●Price cut€386,760-€9,240
30 Sept 2026●Price increase€397,000+€10,240
30 Sept 2026●Price cut€385,000-€12,000
30 Sept 2026●Price cut€382,000-€3,000
30 Sept 2026●Price increase€396,000+€14,000
30 Sept 2026●Price cut€386,760-€9,240
30 Sept 2026●Price increase€397,000+€10,240
30 Sept 2026●Price cut€385,000-€12,000
30 Sept 2026●Price cut€382,000-€3,000
1 Oct 2026●Price increase€396,000+€14,000
1 Oct 2026●Price cut€386,760-€9,240
1 Oct 2026●Price increase€397,000+€10,240
1 Oct 2026●Price cut€385,000-€12,000
1 Oct 2026●Price cut€382,000-€3,000
1 Oct 2026●Price increase€396,000+€14,000
1 Oct 2026●Price cut€386,760-€9,240
1 Oct 2026●Price increase€397,000+€10,240
1 Oct 2026●Price cut€385,000-€12,000
1 Oct 2026●Price cut€382,000-€3,000
1 Oct 2026●Price increase€396,000+€14,000
1 Oct 2026●Price cut€386,760-€9,240
1 Oct 2026●Price increase€397,000+€10,240
1 Oct 2026●Price cut€385,000-€12,000
1 Oct 2026●Price cut€382,000-€3,000
2 Oct 2026●Price increase€396,000+€14,000
2 Oct 2026●Price cut€386,760-€9,240
2 Oct 2026●Price increase€397,000+€10,240
2 Oct 2026●Price cut€385,000-€12,000
2 Oct 2026●Price cut€382,000-€3,000
2 Oct 2026●Price increase€396,000+€14,000
2 Oct 2026●Price cut€386,760-€9,240
2 Oct 2026●Price increase€397,000+€10,240
2 Oct 2026●Price cut€385,000-€12,000
2 Oct 2026●Price cut€382,000-€3,000
2 Oct 2026●Price increase€396,000+€14,000
2 Oct 2026●Price cut€386,760-€9,240
2 Oct 2026●Price increase€397,000+€10,240
2 Oct 2026●Price cut€385,000-€12,000
2 Oct 2026●Price cut€382,000-€3,000
3 Oct 2026●Price increase€396,000+€14,000
3 Oct 2026●Price cut€386,760-€9,240
3 Oct 2026●Price increase€397,000+€10,240
3 Oct 2026●Price cut€385,000-€12,000
3 Oct 2026●Price cut€382,000-€3,000
3 Oct 2026●Price increase€396,000+€14,000
3 Oct 2026●Price cut€386,760-€9,240
3 Oct 2026●Price increase€397,000+€10,240
3 Oct 2026●Price cut€385,000-€12,000
3 Oct 2026●Price cut€382,000-€3,000
4 Oct 2026●Price increase€396,000+€14,000
4 Oct 2026●Price cut€386,760-€9,240
4 Oct 2026●Price increase€397,000+€10,240
4 Oct 2026●Price cut€385,000-€12,000
4 Oct 2026●Price cut€382,000-€3,000
4 Oct 2026●Price increase€396,000+€14,000
4 Oct 2026●Price cut€386,760-€9,240
4 Oct 2026●Price increase€397,000+€10,240
4 Oct 2026●Price cut€385,000-€12,000
4 Oct 2026●Price cut€382,000-€3,000
5 Oct 2026●Price increase€396,000+€14,000
5 Oct 2026●Price cut€386,760-€9,240
5 Oct 2026●Price increase€397,000+€10,240
5 Oct 2026●Price cut€385,000-€12,000
5 Oct 2026●Price cut€382,000-€3,000
5 Oct 2026●Price increase€396,000+€14,000
5 Oct 2026●Price cut€386,760-€9,240
5 Oct 2026●Price increase€397,000+€10,240
5 Oct 2026●Price cut€385,000-€12,000
5 Oct 2026●Price cut€382,000-€3,000
6 Oct 2026●Price increase€396,000+€14,000
6 Oct 2026●Price cut€386,760-€9,240
6 Oct 2026●Price increase€397,000+€10,240
6 Oct 2026●Price cut€385,000-€12,000
6 Oct 2026●Price cut€382,000-€3,000
7 Oct 2026●Price increase€396,000+€14,000
7 Oct 2026●Price cut€386,760-€9,240
7 Oct 2026●Price increase€397,000+€10,240
7 Oct 2026●Price cut€385,000-€12,000
7 Oct 2026●Price cut€382,000-€3,000
7 Oct 2026●Price increase€396,000+€14,000
7 Oct 2026●Price cut€386,760-€9,240
7 Oct 2026●Price increase€397,000+€10,240
7 Oct 2026●Price cut€385,000-€12,000
7 Oct 2026●Price cut€382,000-€3,000
7 Oct 2026●Price increase€396,000+€14,000
7 Oct 2026●Price cut€386,760-€9,240
7 Oct 2026●Price increase€397,000+€10,240
7 Oct 2026●Price cut€385,000-€12,000
7 Oct 2026●Price cut€382,000-€3,000
8 Oct 2026●Price increase€396,000+€14,000
8 Oct 2026●Price cut€386,760-€9,240
8 Oct 2026●Price increase€397,000+€10,240
8 Oct 2026●Price cut€385,000-€12,000
8 Oct 2026●Price cut€382,000-€3,000
8 Oct 2026●Price increase€396,000+€14,000
8 Oct 2026●Price cut€386,760-€9,240
8 Oct 2026●Price increase€397,000+€10,240
8 Oct 2026●Price cut€385,000-€12,000
8 Oct 2026●Price cut€382,000-€3,000
8 Oct 2026●Price increase€396,000+€14,000
8 Oct 2026●Price cut€386,760-€9,240
8 Oct 2026●Price increase€397,000+€10,240
8 Oct 2026●Price cut€385,000-€12,000
8 Oct 2026●Price cut€382,000-€3,000
9 Oct 2026●Price increase€396,000+€14,000
9 Oct 2026●Price cut€386,760-€9,240
9 Oct 2026●Price increase€397,000+€10,240
9 Oct 2026●Price cut€385,000-€12,000
9 Oct 2026●Price cut€382,000-€3,000
9 Oct 2026●Price increase€396,000+€14,000
9 Oct 2026●Price cut€386,760-€9,240
9 Oct 2026●Price increase€397,000+€10,240
9 Oct 2026●Price cut€385,000-€12,000
9 Oct 2026●Price cut€382,000-€3,000
10 Oct 2026●Price increase€396,000+€14,000
10 Oct 2026●Price cut€386,760-€9,240
10 Oct 2026●Price increase€397,000+€10,240
10 Oct 2026●Price cut€385,000-€12,000
10 Oct 2026●Price cut€382,000-€3,000
10 Oct 2026●Price increase€396,000+€14,000
10 Oct 2026●Price cut€386,760-€9,240
10 Oct 2026●Price increase€397,000+€10,240
10 Oct 2026●Price cut€385,000-€12,000
10 Oct 2026●Price cut€382,000-€3,000
10 Oct 2026●Price increase€396,000+€14,000
10 Oct 2026●Price cut€386,760-€9,240
10 Oct 2026●Price increase€397,000+€10,240
10 Oct 2026●Price cut€385,000-€12,000
10 Oct 2026●Price cut€382,000-€3,000
10 Oct 2026●Price increase€396,000+€14,000
10 Oct 2026●Price cut€386,760-€9,240
10 Oct 2026●Price increase€397,000+€10,240
10 Oct 2026●Price cut€385,000-€12,000
10 Oct 2026●Price cut€382,000-€3,000
10 Oct 2026●Price increase€396,000+€14,000
10 Oct 2026●Price cut€386,760-€9,240
10 Oct 2026●Price increase€397,000+€10,240
10 Oct 2026●Price cut€385,000-€12,000
10 Oct 2026●Price cut€382,000-€3,000
10 Oct 2026●Price increase€396,000+€14,000
10 Oct 2026●Price cut€386,760-€9,240
10 Oct 2026●Price increase€397,000+€10,240
10 Oct 2026●Price cut€385,000-€12,000
10 Oct 2026●Price cut€382,000-€3,000
11 Oct 2026●Price increase€396,000+€14,000
11 Oct 2026●Price cut€386,760-€9,240
11 Oct 2026●Price increase€397,000+€10,240
11 Oct 2026●Price cut€385,000-€12,000
11 Oct 2026●Price cut€382,000-€3,000
11 Oct 2026●Price increase€396,000+€14,000
11 Oct 2026●Price cut€386,760-€9,240
11 Oct 2026●Price increase€397,000+€10,240
11 Oct 2026●Price cut€385,000-€12,000
11 Oct 2026●Price cut€382,000-€3,000
11 Oct 2026●Price increase€396,000+€14,000
11 Oct 2026●Price cut€386,760-€9,240
11 Oct 2026●Price increase€397,000+€10,240
11 Oct 2026●Price cut€385,000-€12,000
11 Oct 2026●Price cut€382,000-€3,000
11 Oct 2026●Price increase€396,000+€14,000
11 Oct 2026●Price cut€386,760-€9,240
11 Oct 2026●Price increase€397,000+€10,240
11 Oct 2026●Price cut€385,000-€12,000
11 Oct 2026●Price cut€382,000-€3,000
11 Oct 2026●Price increase€396,000+€14,000
11 Oct 2026●Price cut€386,760-€9,240
11 Oct 2026●Price increase€397,000+€10,240
11 Oct 2026●Price cut€385,000-€12,000
11 Oct 2026●Price cut€382,000-€3,000
11 Oct 2026●Price increase€396,000+€14,000
11 Oct 2026●Price cut€386,760-€9,240
11 Oct 2026●Price increase€397,000+€10,240
11 Oct 2026●Price cut€385,000-€12,000
11 Oct 2026●Price cut€382,000-€3,000
12 Oct 2026●Price increase€396,000+€14,000
12 Oct 2026●Price cut€386,760-€9,240
12 Oct 2026●Price increase€397,000+€10,240
12 Oct 2026●Price cut€385,000-€12,000
12 Oct 2026●Price cut€382,000-€3,000
12 Oct 2026●Price increase€396,000+€14,000
12 Oct 2026●Price cut€386,760-€9,240
12 Oct 2026●Price increase€397,000+€10,240
12 Oct 2026●Price cut€385,000-€12,000
12 Oct 2026●Price cut€382,000-€3,000
13 Oct 2026●Price increase€396,000+€14,000
13 Oct 2026●Price cut€386,760-€9,240
13 Oct 2026●Price increase€397,000+€10,240
13 Oct 2026●Price cut€385,000-€12,000
13 Oct 2026●Price cut€382,000-€3,000
13 Oct 2026●Price increase€396,000+€14,000
13 Oct 2026●Price cut€386,760-€9,240
13 Oct 2026●Price increase€397,000+€10,240
13 Oct 2026●Price cut€385,000-€12,000
13 Oct 2026●Price cut€382,000-€3,000
14 Oct 2026●Price increase€396,000+€14,000
14 Oct 2026●Price cut€386,760-€9,240
14 Oct 2026●Price increase€397,000+€10,240
14 Oct 2026●Price cut€385,000-€12,000
14 Oct 2026●Price cut€382,000-€3,000
14 Oct 2026●Price increase€396,000+€14,000
14 Oct 2026●Price cut€386,760-€9,240
14 Oct 2026●Price increase€397,000+€10,240
14 Oct 2026●Price cut€385,000-€12,000
14 Oct 2026●Price cut€382,000-€3,000
15 Oct 2026●Price increase€396,000+€14,000
15 Oct 2026●Price cut€386,760-€9,240
15 Oct 2026●Price increase€397,000+€10,240
15 Oct 2026●Price cut€385,000-€12,000
15 Oct 2026●Price cut€382,000-€3,000
15 Oct 2026●Price increase€396,000+€14,000
15 Oct 2026●Price cut€386,760-€9,240
15 Oct 2026●Price increase€397,000+€10,240
15 Oct 2026●Price cut€385,000-€12,000
15 Oct 2026●Price cut€382,000-€3,000
16 Oct 2026●Price increase€396,000+€14,000
16 Oct 2026●Price cut€386,760-€9,240
16 Oct 2026●Price increase€397,000+€10,240
16 Oct 2026●Price cut€385,000-€12,000
16 Oct 2026●Price cut€382,000-€3,000
16 Oct 2026●Price increase€396,000+€14,000
16 Oct 2026●Price cut€386,760-€9,240
16 Oct 2026●Price increase€397,000+€10,240
16 Oct 2026●Price cut€385,000-€12,000
16 Oct 2026●Price cut€382,000-€3,000
16 Oct 2026●Price increase€396,000+€14,000
16 Oct 2026●Price cut€386,760-€9,240
16 Oct 2026●Price increase€397,000+€10,240
16 Oct 2026●Price cut€385,000-€12,000
16 Oct 2026●Price cut€382,000-€3,000
17 Oct 2026●Price increase€396,000+€14,000
17 Oct 2026●Price cut€386,760-€9,240
17 Oct 2026●Price increase€397,000+€10,240
17 Oct 2026●Price cut€385,000-€12,000
17 Oct 2026●Price cut€382,000-€3,000
17 Oct 2026●Price increase€396,000+€14,000
17 Oct 2026●Price cut€386,760-€9,240
17 Oct 2026●Price increase€397,000+€10,240
17 Oct 2026●Price cut€385,000-€12,000
17 Oct 2026●Price cut€382,000-€3,000
18 Oct 2026●Price increase€396,000+€14,000
18 Oct 2026●Price cut€386,760-€9,240
18 Oct 2026●Price increase€397,000+€10,240
18 Oct 2026●Price cut€385,000-€12,000
18 Oct 2026●Price cut€382,000-€3,000
18 Oct 2026●Price increase€396,000+€14,000
18 Oct 2026●Price cut€386,760-€9,240
18 Oct 2026●Price increase€397,000+€10,240
18 Oct 2026●Price cut€385,000-€12,000
18 Oct 2026●Price cut€382,000-€3,000

Mortgage

€1,613
/ month over 25 years
● Down payment 20% · €76,400● Borrowed · €305,600 · 4%
Term
Alexinvest logo
View original listing →
● Data retrieved from the agency's website

Similar properties in Naast

See all similar properties →